[Laszlo-dev] For Review: 20080626-laszlo-8 Summary: Time in calendar can be changed to end before it starts
Philip Romanik
promanik at laszlosystems.com
Thu Jun 26 15:04:15 PDT 2008
I found a couple of issues.
- If you create a new event you can edit the start/stop time such
that the event is displayed outside the area for that day. I don't
think this behavior is caused by this changeset but I figured I would
ask. If it is old behavior can you create a jira task for it.
- Expand the stop time until it hits 11:45 pm. If you edit the start
time in the infopanel, the end time is adjusted incorrectly.
>Change 20080626-laszlo-8 by laszlo at T43-L3XEXMW on 2008-06-26 14:16:10 EDT
> in /home/laszlo/src/svn/openlaszlo/trunk-liquid
> for
> <http://svn.openlaszlo.org/openlaszlo/trunk>http://svn.openlaszlo.org/openlaszlo/trunk
>
>Summary: Time in calendar can be changed to end before it starts
>
>New Features:
>
>Bugs Fixed: LPP-6315 - Time in calendar can be changed to end before it starts
>
>Technical Reviewer: max
>QA Reviewer: promanik
>Doc Reviewer: (pending)
>
>Documentation:
>
>Release Notes:
>
>Details: Since events aren't really designed, currently, to be
> spread across multiple days, I limited events so that they
> can't run over into the next day. Having multi-day events
> would require too dramatic an overhaul to the entire app.
>
> Also, there was a weird issue with the time being a half an
> hour off, which was the result of the background grid being
> pushed down a bit so that "12AM" wasn't clipped at the top.
> I could've either adjusted the grid so that it WAS clipped,
> or changed the events to compensate, so I did the latter.
>
>Tests: Open Calendar in SWF or DHTML. Create a new event, or
> edit an existing event. Click the time arrow. The event
> end time should stop before spilling over into the next day.
> If you drag the event to a later time, the end time should
> auto-adjust so that it doesn't spill over into the next day
> as well. (You can't create an eight-hour event at noon and
> then drag it to 9 PM and have it run into the next day at
> eight hours in length.)
>
> Also, when the day is expanded, the events should now be at
> the right time on the time grid, instead of half an hour off.
>
>Files:
>M demos/calendar/cal-data.lzx
>M demos/calendar/event.lzx
>
>Changeset:
><http://svn.openlaszlo.org/openlaszlo/patches/20080626-laszlo-8.tar>http://svn.openlaszlo.org/openlaszlo/patches/20080626-laszlo-8.tar
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://www.openlaszlo.org/pipermail/laszlo-dev/attachments/20080626/5016901d/attachment.html
More information about the Laszlo-dev
mailing list